Module 4 — Inspection & Reliability
Objective: pass inspection and survive matches.
Prereqs: Wired system and battery plan.
Steps
- Tug-test every connection; check CAN continuity and IDs.
- Verify radio mount, PoE/injector, and power; check breaker accessibility.
- Run full bot power-on test; confirm brownout indicators are clear.
- Confirm wiring color/labeling meets inspection expectations; secure loose wires/hoses.
- Test comms to DS and bandwidth usage; confirm radio firmware/current year image if required.
- Inspect for metal shavings; vacuum/air clear electronics if drilling was done nearby.
- Re-run pull-tests on high-risk connections (battery, main breaker, radio power) before events.
Deliverables
- Completed electrical inspection checklist signed before integration.
- Notes on any remediation required before event inspection.
Resources
- REV wiring guide: docs.revrobotics.com/firstrobotics/wiring-guide
- Spectrum wiring guide: Spectrum FRC Electrical Guide.pdf
- Electrical Bible (legacy fundamentals): UPDATED Electrical Bible.pdf
Instructions (numbered)
- Tug-test all connections; verify CAN continuity and IDs.
- Confirm radio mount, PoE/injector, firmware/image, and breaker accessibility.
- Run full power-on; check logs for brownouts; validate comms to DS and bandwidth.
- Check labeling/color coding; secure loose wires/hoses; ensure no sharp edges contact wiring.
- Inspect for metal shavings; vacuum/air clean if any drilling occurred nearby.
- Re-pull-test high-risk points (battery, main breaker, radio power) before events.
Example
- Pre-event check: CAN OK, radio fw current, no brownouts in log, battery lugs re-pull-tested, shavings cleared after pit drilling.
Best practices
- Use a printed inspection checklist; sign/date.
- Do a quick power cycle and comms check before every event day.
- Keep spare fuses/breakers and labeled spare cables.
Common mistakes
- Skipping re-tests after pit work.
- Loose radio mount/antennas causing intermittent drops.
- Hidden shavings causing intermittent shorts.
Checklist
- Tug tests done (battery/main/radio emphasized)
- CAN IDs/continuity verified
- Radio mount/PoE/firmware checked
- Brownout/log review done
- Labels/color coding correct
- Shavings cleared
- Comms/bandwidth check passed
Recommended tools
- Multimeter, CAN health tool, vacuum/air, labeler, spare fuses/breakers, inspection checklist.
Sample log (template)
- Date:
- Checks performed:
- Issues found:
- Fixes applied:
- Ready for inspection? (Y/N):
Photos/diagrams
- [Placeholder: annotated board photo showing inspection points]