Week 3: Integration and Tuning
Schedule constraint: Mon/Wed/Thu 2:30–6:00 pm (~10.5 hrs).
Goals
- CAD frozen; wiring checked against plan.
- L2 climb repeatable on robot (>=90%).
- Autos integrated with hub-state data; 80% success across 10 runs.
- Driver practice with shift timer and hoard/burst pattern.
- Auto validation sheet (10 runs, pass/fail, notes) filled.
- Climb repeatability sheet filled.
- Driver drill script (shift-timer drills) used.
Plan & time budget (ETA ~10.5 hrs, Thu as buffer)
- 2.0h: CAD freeze review; wiring inspection (PD/radio/breakers).
- 2.0h: L2 climb on robot; 10 attempts, log current/time, tune.
- 1.5h: Autos integration test (fuel+L1, fuel-only); 10 runs each.
- 1.0h: Driver practice with shift timer cues; video + notes.
- 0.5h: Debrief and doc updates.
Checklist
- CAD release posted and frozen
- Wiring check complete; PD/radio per rules
- L2 climb 9/10 success on robot
- Autos 8/10 success with hub-state data
- Driver practice logged with shift-timer use
- Auto validation sheet completed
- Climb repeatability sheet completed
- Driver drill script executed
- Risks/dependencies updated
Owners
- CAD Lead: freeze
- Electrical Lead: wiring check
- Software Lead: autos integration
- Drive Coach: practice session
Risks and mitigations
- Risk: Auto drift. Mitigation: odometry reset, slow speeds, retune FF/drive PID.
- Risk: Climb repeatability. Mitigation: add hard stops, tweak ramp/current limits.
Priorities (P0 must, P1 should, P2 stretch)
- P0: CAD frozen; wiring check; L2 climb 9/10; autos 8/10; driver drill with shift timer.
- P1: Auto validation sheet; climb repeatability sheet; driver drill script executed.
- P2: Start tuning any L3/climb stretch goals cautiously.
Time tracking tips
- Time autos per run; log pass/fail quickly; avoid more than 10 runs per block without adjustments.
- Track climb attempts count; stop after 10 and analyze before more.
Tips for students
- Reset odometry carefully before each auto run; be consistent on starting pose.
- Capture video for every climb attempt; note what changed between runs.
Tips for mentors
- Focus on reducing variables: slow down autos if drift appears; simplify routes.
- After 10 tests, enforce a review break to adjust PID/FF instead of brute-forcing.